Power supply to Khesht oil field
Posted By : | Date :04-28-2016
According to units of Khesht power supply with a nominal capacity MVA 12 that its studies started in2005 and in the middle of year in 2006 ended and its EPC plan stated in 2008 an ended in 2011. Location: Konartakhteh city, fars province Brief description of project goals: Power supply to the processing units of Khesht includes establishment 20/66 KW, in the vicinity of Khesht, construction of two circuit line of Taksimeh 66 KW from future post builder 230/66 KW Vahdateyeh to post 20/66 KW mentioned in the preceding paragraph…
More
0  Comments
Khesht Oil Field
Posted By : | Date :04-28-2016
Is located in the Southern part of Zagros Mountains. The geographical location of the field is in the Konar Takhteh city, between Kazeron and Borazjan, 190 Km of Shiraz, on the border of Bushehr province. The project defined to increase the Sarvestan and Saadatabad oilfield total production capacity to 30,000 BOPD and injection the associated gas of Sarvestan to Saadatabad oilfield. 3D lane seismic data acquisition and processing of 450Km2 Processing of the existing 2D seismic acquisition Comprehensive reservoir study and management including EOR/OR Conceptual and basic engineering Construction of…
More
0  Comments
Gathering and injection of associated gas of Cheshmekhosh
Posted By : | Date :04-28-2016
Location: 70 Km West of Andimeshk Brief description of project goals: Perform basic of design review, detailed design, purchase and supply of goods and equipment required of the project, packing and transportation of the land and sea, disembarkation, customs and clearance, insurance, operations of construction and architectural and mechanical and installation, delivery and guaranty within period of warranty, observing all issues of salty, health, environmental in form of (EPC) for gathering and injection of associated gas of cheshmehkhosh. Description of field: The project uses of 2 gas wells for injection…
More
0  Comments
Wellhead equipment of Cheshmehkhosh
Posted By : | Date :04-28-2016
The field is located 70 Km West of Andimeshk. Work explanation: Construction of wellhead equipment and flow pipelines of new production wells P1 to P4 and injection wells G1, G2. Construction, supply and installation of hydraulic control panel of wells P1 to P4 and G1, G2 and supply of control panel wells No. 8 , 9 of Cheshmehkhosh.
More
0  Comments
Development production unit of Cheshmehkhosh
Posted By : | Date :04-28-2016
Location: 70 Km west of Andimesk Brief description of project goals: Development production unit of Cheshmehkhosh The number of wells input to production unit manifold about 44 wells relates to Cheshmehkhosh, 2 wells relates to Dalpari, 9 wells relates to field of Aban, 3 wells relates to Paydar’s field and 28 wells relates to west of Paydar that except field of Cheshmehkhosh the rest of the field and field of Dehloran each wells with a pipeline comes to production unit manifold of Cheshmeh khosh . Work explanation: Authentication and basic…
More
0  Comments
16-Oil fields Development Program
Posted By : | Date :04-26-2016
National Iranian South Oil Company because of increasing internal & external needs to hydrocarbon resources needed to sustainability and continuous increase oil production. For this purpose the exploration and development of oil fields is in the first place in its programs. In this regard west oil field development project in the form of development plan of the 16-fiels and Cheshmekhosh has been handed over to OEID. The plan included preliminary examination of seismic operations, processing, interpretation of seismology, and comprehensive studies of storage and preparation of development plan and then…
More
0  Comments
Field Engineering and Supervision of Iranian Oil Terminals Company Projects
Posted By : | Date :04-25-2016
Client : Iranian Oil Terminals Company Description: Supervision services, engineering work of oil Terminal company are located in the Kharg Island, North oil Terminal (NEKA), ASALOUYEH, other operational area, and also perform design review projects Engineering and supervision services detective Services planning and project control Engineering services, design review Contract services and costing
More
0  Comments
Construction Project of Trains 3-4 and Condensate Storage Tanks, (Phases 20&21) South Pars
Posted By : | Date :04-25-2016
Client: Oil Industries Engineering & Construction (OIEC) Location of this phase is in the Persian Gulf and the site No.1 Special Economic Zone of South Pars which is located in BANDAR ASALOUYEH. The main objection of this project is the following: 25 million cubic meters of gas sweeting ( changing sour gas to gas sweeting) and send it to nation grid, sour gas of this containing compounds such as CO2, H2S and mercaptans and condensate which should be separated from the gas inlet before transfer in to nationwide. Another purpose…
More
0  Comments
Consulting and supervision wellhead equipment project and transmission and processing development oil field of Azar
Posted By : | Date :04-24-2016
Client: Sarvak Azar Engineering Development (SAED) Type of project: Supervision Location:Anara exploration’s block in Ilam province (South west of Iran) near the border of Iran and Iraq, Northwest of process units of Cheshmehkhosh. Brief description of project goals: The main objective of the project is to increase the volume of oil extraction from Sarvak. Azar oil field, including wells and equipment to achieve the objective of the project with total production 65,000 barrels per day which will be done in two stages. Description of the field: First stage: ( Early Production)…
More
0  Comments
Consulting and supervision of project drilling Azar oil field development
Posted By : | Date :04-24-2016
Client: Sarvak Azar Engineering Development (SAED) Type of project: supervision Location: 20 Km Southeast of Ahvaz Brief description of project goals: Daily production 65,000 barrels oil includes 30,000 daily production barrels oil early production (EP), and 65,000 barrels oil in the final production (EP). Description of field: Drilling of oil field of Azar includes 3 separator packages just EPDS that offered to contractors. Each package includes drilling engineering services, supply of goods, providing drilling services, transportation services, operation base preparation, and well completion. Totally 19wells will be repaired and drilled.…
More
0  Comments
1 2