North Yaran Oil Field Development
Posted By : | Date :04-24-2016
Client: Petroleum Engineering & Development Company (PEDEC) Description: All activities of consulting engineering including consulting services monitoring of subsurface administration have been handed to the OEID.  North Yaran oil field is located in 130 km southwest of Ahwaz and in the west of south Azadegan's field in the Iraq's central bar. The project development of field by drilling 20 wells with goal to produce 30 thousand barrels of oil from the reservoir of Sarvak is done.
More
0  Comments
Yadavaran Oil field Development Project
Posted By : | Date :04-24-2016
Client: Petroleum Engineering &Development company (PEDEC) Description: The management plan of phase No.1 of the project has been granted to Oil and Energy Industries Development Co. and Kish Oil Engineering Co. The purpose of the project is in the first phase to reach 85,000 barrels per day that the amount in the second phase will reach 180,000 barrels per day and in the end of third phase to produce 300,000 barrels per day
More
0  Comments
Wellhead equipment and flow lines of South Azadegan Oil Fields
Posted By : | Date :04-24-2016
Client: Petroleum Engineering & Development Company (PEDEC) Description: Azadegan Oil Field is located South Western corner of Iran in the province of Khuzestan near the border between Iran and Iraq. In the first phase of field development, oil and gas collected of 176 new wells in addition to 25 existing wells (201 wells) by ten central collection unit (Manifold) and gas oil separation plants (GOSP) in North and South and then will be transferred to central processing unit (CTPE).15 wells of 176 new wells, will be implemented in the early production…
More
0  Comments
Optimization of Processing System Oil Field Haftkel
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company Description: The field is located between Naft Sefid and MaNaTin in the northeast of Ahwaz. The field was discovered in 1306 and it was the first tank of the gas injection. The length and width was respectively, 32 and 4/8 and now two units operating of Haftkel 1 and Haftkel 4 is responsible for processing oil field. To optimize processing system and also collection and gas injection oil field of Haftkel, is scheduled to take the following actions: Construction of manifold and cluster with…
More
0  Comments
1 2