According to units of Khesht power supply with a nominal capacity MVA 12 that its studies started in2005 and in the middle of year in 2006 ended and its EPC plan stated in 2008 an ended in 2011.
Location: Konartakhteh city, fars province
Brief description of project goals:
Power supply to the processing units of Khesht includes establishment 20/66 KW, in the vicinity of Khesht, construction of two circuit line of Taksimeh 66 KW from future post builder 230/66 KW Vahdateyeh to post 20/66 KW mentioned in the preceding paragraph in length of 15Km and network 20 Kilo vat of wellhead in length of 8 Km.
Work explanation:
Power supply to processing units of Khesht includes:
- Establishment 63/20 Kilo Vat in vicinity of Khesht unit CPF
- Construction of line transmission 63 KW from Vahdateyeh to CPF in length of 15 Km
- Construction lines 20 KW for feeding domestic wellhead and residential camp in length of 8 Km
- Construction of two machines 63 KW in Vahdateyeh