Transferring salty oil of Gachsaran No.1 to desalting unit of Gachsaran No. 2
Posted By : | Date :04-24-2016
Client: NISOC Type of project: PC The subject is transferring multi way saline oil to Gachsaran 1 production unit, separating the present production equipment in production unit, designing, constructing, and installing degassing tank, constructing 16 and 6 inch pipelines for transferring oil and connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit, constructing 8-inch pipelines of Northeast, Southwest, burners. Connection of pipeline 4 inch, waste disposal to new pipeline, transmission of associated water, construction of…
More
0  Comments
Engineering, Procurement and Construction of Gachsaran Desalting unit
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company (NISOC) Location: The Project is located in the region of Dashte Balot region, Gachsaran city. Based on the tender, construction desalting unit of Gachsaran NO.2 and facilities for processing salty petroleum was awarded to OEID Description This project was awarded to OEID in form EPC. The major part of project includes the design, construction and production of 2 rows of desalting unit (Capacity of 55,000 barrels per day), design and implementation of water systems thinners, oil contaminated wastewater treatment, compressed air supply fuel gas…
More
0  Comments