Engineering, Procurement and Construction of Gachsaran Desalting unit

Engineering, Procurement and Construction of Gachsaran Desalting unit

Client: National Iranian South Oil Company (NISOC)

Location:

The Project is located in the region of Dashte Balot region, Gachsaran city.

Based on the tender, construction desalting unit of Gachsaran NO.2 and facilities for processing salty petroleum was awarded to OEID

Description

This project was awarded to OEID in form EPC.

The major part of project includes the design, construction and production of 2 rows of desalting unit (Capacity of 55,000 barrels per day), design and implementation of water systems thinners, oil contaminated wastewater treatment, compressed air supply fuel gas to diesel fuel, drinking water supply, chemical injection, purified water contaminated with oil, water injection surplus to injection in wells, Pit fuel burner, water supply, desalting unit and waste water disposal and injection in wells , construction of input salt crude oil to the unit, desalting oil pipeline to storage tanks, natural gas supply line required by the factory as well construction of control building and MCC, guard the entrance gate and generator building and landscaping operations, fencing, constructions of evaporation pounds, tanks and oil water separators, network collects of surface water, fire pumps and canopies that has come into operation in 1378.

It is worth nothing desalted and indirect Heater for the first time in the interior design, and was built in one of the interior factories

Home > CompletedProjects > Engineering, Procurement and Construction of Gachsaran Desalting unit
0 Comment