Client: Oil Industries Engineering & Construction (OIEC)
Location of this phase is in the Persian Gulf and the site No.1 Special Economic Zone of South Pars which is located in BANDAR ASALOUYEH.
The main objection of this project is the following:
25 million cubic meters of gas sweeting ( changing sour gas to gas sweeting) and send it to nation grid, sour gas of this containing compounds such as CO2, H2S and mercaptans and condensate which should be separated from the gas inlet before transfer in to nationwide. Another purpose of this project is storage of condensate of 2400million cubic meters of gas condensate and also preparing for the storage tanks and export.
Constriction of all industrial and non-industrial and building and contraction and installation of all structures, pipework and underground works, mechanical equipment’s, electrical, instrument, insulation, painting all equipment and pipes pre-commissioning in the processing parts and ancillary facilities under:
- Train3 and Train 4 of refinery process operation:
- Gas sweetening
- Dehydration
- Ethan recovery
- Diesel tank unit and emergency generators
- Temporary storage tank of propane
- Chemical storage unit
- Interface main pipes
- Propane gas refrigeration
- condensate storage and export liquids with 240 million cube meters volume
- Pump Station