OEID Completed Projects

  • Engineering design, Procurement, Construction of Flare Stacks and Tips of Pazanan gas injection Plant in 1997 For NISOC.
  • Engineering design, Procurement, Construction of Flare Stacks and Tips of Khangiran Plant in 1999 for NISOC.
  • Engineering design, Procurement, Construction and Commissioning of Demine Water Unit of Shazand Refinery in 1999 for IKORC.
  • Engineering design of Air Preheater of Tehran Refinery Furance(H-101) in 2000 for TORC.
  • Design and Execution of Hydrocarbon Products Tanks, including loading and Unloading Systems in 2000 for IKORC.
  • Engineering and Fabrication of 21 Heat Exchangers of Lavan Refinery in 2001 for LORC, implemented by special alloy steel with new technology for first time in IRAN.