Optimization of Processing System Oil Field Haftkel
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company Description: The field is located between Naft Sefid and MaNaTin in the northeast of Ahwaz. The field was discovered in 1306 and it was the first tank of the gas injection. The length and width was respectively, 32 and 4/8 and now two units operating of Haftkel 1 and Haftkel 4 is responsible for processing oil field. To optimize processing system and also collection and gas injection oil field of Haftkel, is scheduled to take the following actions: Construction of manifold and cluster with…
More
0  Comments