Posted By : | Date :04-28-2016
Is located in the Southern part of Zagros Mountains. The geographical location of the field is in the Konar Takhteh city, between Kazeron and Borazjan, 190 Km of Shiraz, on the border of Bushehr province. The project defined to increase the Sarvestan and Saadatabad oilfield total production capacity to 30,000 BOPD and injection the associated gas of Sarvestan to Saadatabad oilfield. 3D lane seismic data acquisition and processing of 450Km2 Processing of the existing 2D seismic acquisition Comprehensive reservoir study and management including EOR/OR Conceptual and basic engineering Construction of…
More 0  Comments
Posted By : | Date :04-28-2016
The field is located 120 km away from west of Dezful and its development (project) includes work over of wells, drilling of new wells, gathering and transferring lines construction of production unit, new desalination and construction of residential camp. All stages of the implementation of access router and work over of wells and construction of facilities well No.23 and pipelines to flow to production unit of Dehloran ended and has handed over to the user.it should be noted production factory and desalination has been launched and is delivered into user
More 0  Comments
Posted By : | Date :04-24-2016
Client: Petroleum Engineering & Development Company (PEDEC) Description: All activities of consulting engineering including consulting services monitoring of subsurface administration have been handed to the OEID. North Yaran oil field is located in 130 km southwest of Ahwaz and in the west of south Azadegan's field in the Iraq's central bar. The project development of field by drilling 20 wells with goal to produce 30 thousand barrels of oil from the reservoir of Sarvak is done.
More 0  Comments
Posted By : | Date :04-24-2016
Client: Petroleum Engineering &Development company (PEDEC) Description: The management plan of phase No.1 of the project has been granted to Oil and Energy Industries Development Co. and Kish Oil Engineering Co. The purpose of the project is in the first phase to reach 85,000 barrels per day that the amount in the second phase will reach 180,000 barrels per day and in the end of third phase to produce 300,000 barrels per day
More 0  Comments
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company (NISOC) Location: Kabod oil field is located in 70 kilometers north of Andimeshk. Description: The project was to increase the production of oil field up to 12 thousand barrels per day was associated with observing avoid burring gases and avoid compliance is included: Construction of 2 well head equipment (KB2 , KB3) Construction of two series of pipeline 6-inch ground wells KF2 KF3 with Length approximately 6 Km Development Of Kabod Separation Field( KSF) Construction of 10- inch underground pipeline to transport oil along…
More 0  Comments
Posted By : | Date :04-24-2016
Client: NISOC Type of project: PC The subject is transferring multi way saline oil to Gachsaran 1 production unit, separating the present production equipment in production unit, designing, constructing, and installing degassing tank, constructing 16 and 6 inch pipelines for transferring oil and connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit, constructing 8-inch pipelines of Northeast, Southwest, burners. Connection of pipeline 4 inch, waste disposal to new pipeline, transmission of associated water, construction of…
More 0  Comments