Posted By : | Date :04-24-2016
CLIENT: National Iranian South Oil Company (NISOC) TYPE OF PROJECT: Seismic THE GEORAPHICAL LOCATION: 200 Km South of Ahvaz between 4province of Khuzestan, Kohgiloyeh and Boyrahmad, Bushehr, Fars Brief description of project goals: The aim of the project is 3D seismic survey of oil fields of Bibihakimeh, Seyahmakan, Kilver Karim and also providing related services with desert and rugged mountains so that the topography area was changing from flat area to mountainous, but 70% of area is mountainous (elevation changes from 10 to 1200m) and 3D seismic survey data is…
More 0  Comments
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company (NISOC) Location: Kabod oil field is located in 70 kilometers north of Andimeshk. Description: The project was to increase the production of oil field up to 12 thousand barrels per day was associated with observing avoid burring gases and avoid compliance is included: Construction of 2 well head equipment (KB2 , KB3) Construction of two series of pipeline 6-inch ground wells KF2 KF3 with Length approximately 6 Km Development Of Kabod Separation Field( KSF) Construction of 10- inch underground pipeline to transport oil along…
More 0  Comments
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company Description: The field is located between Naft Sefid and MaNaTin in the northeast of Ahwaz. The field was discovered in 1306 and it was the first tank of the gas injection. The length and width was respectively, 32 and 4/8 and now two units operating of Haftkel 1 and Haftkel 4 is responsible for processing oil field. To optimize processing system and also collection and gas injection oil field of Haftkel, is scheduled to take the following actions: Construction of manifold and cluster with…
More 0  Comments
Posted By : | Date :04-24-2016
Client: NISOC Type of project: PC The subject is transferring multi way saline oil to Gachsaran 1 production unit, separating the present production equipment in production unit, designing, constructing, and installing degassing tank, constructing 16 and 6 inch pipelines for transferring oil and connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit connate water respectively from Gachsaran 1 production unit, Gachsaran 2 desalting unit, constructing 8-inch pipelines of Northeast, Southwest, burners. Connection of pipeline 4 inch, waste disposal to new pipeline, transmission of associated water, construction of…
More 0  Comments
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company (NISOC) Location: The Project is located in the region of Dashte Balot region, Gachsaran city. Based on the tender, construction desalting unit of Gachsaran NO.2 and facilities for processing salty petroleum was awarded to OEID Description This project was awarded to OEID in form EPC. The major part of project includes the design, construction and production of 2 rows of desalting unit (Capacity of 55,000 barrels per day), design and implementation of water systems thinners, oil contaminated wastewater treatment, compressed air supply fuel gas…
More 0  Comments