Sarvestan and Saadatabad Oil Fields
Posted By : | Date :04-28-2016
Sarvestan and Saadatabad Oil Fields are located in the south of Iran in Zagros Mountains. The field of Sarvestan is located in 110 km southeast of Shiraz and the field of Saadatabad is located in 20 km from North of Sarvestan field. The purpose of this project is development of oil fields and daily production about 25000 barrels of oil and gas injection to the Saadatabad and oil field. Due to variety and a volume of operation in different parts of the project, desired operations and executive priority according to…
More
0  Comments
Power supply to processing oil field of Sarvestan and Saadatabad
Posted By : | Date :04-28-2016
Power supply to the processing units of Sarvestan and Saadatabad with power of 13/5 MVA that its studies stared in 2005 and ended in 2006 and EPC plan was awarded to contractor. Brief description of project goals: Power supply to the processing units of Sarvestan and Saadatabad includes a power station 6/20/66 kilo volt with capacity MVA 42.5 DOBL, a transmission device line 6/20/66 kilo volt with capacity MVA45 DOBL with length of 52 Km, distributions line wellhead 20 Kilo volt with capacity MVA 12.5 DOBL and with length of…
More
0  Comments
East Paydar Fields and West Paydar Oil Fields
Posted By : | Date :04-28-2016
Paydar field is located in 110 km northwest of Ahwaz and 10 km from the border of Iraq and west Paydar's field is located 20 km Paydar's field. The aim of this project is to increase the daily production rate of 3,000 barrels of oil per day (1,500 barrels from Paydar and 1500 barrels from west Paydar) to 20,000 barrels per day (500 barrels from Paydar and 15,000 barrels from west Paydar). All projects in this field are over. 2D seismic Paydar field has been done in an area of…
More
0  Comments
Crude Oil Floating Roof Tank Fields of Sarvestan and Saadatabad
Posted By : | Date :04-28-2016
Location: Fars Province Brief description of project goals: Construction of three storage crude oil tank with capacity of 50,000 barrels, in the refinery of Shiraz in order to storage of production crude oil from oil fields of Sarvestan and Saadatabd Work explanation: Construction of three storage of crude oil field floating roof tank with capacity of each tank 50,000 barrels in the place of Tank Farm Shiraz refinery that oil processed was stored from oil fields of Sarvestan and Saadatabd
More
0  Comments
Dehloran oil field
Posted By : | Date :04-28-2016
The field is located 120 km away from west of Dezful and its development (project) includes work over of wells, drilling of new wells, gathering and transferring lines construction of production unit, new desalination and construction of residential camp. All stages of the implementation of access router and work over of wells and construction of facilities well No.23 and pipelines to flow to production unit of Dehloran ended and has handed over to the user.it should be noted production factory and desalination has been launched and is delivered into user
More
0  Comments
2D Seismic data processing project in fields of Mezzouna and Fawar in Tunisia
Posted By : | Date :04-24-2016
Development of FAWAR and MEZZOUNA blocks is planned by FAPCO Ltd Tunisia. In accordance to this purpose, the Contract has been made on 16, June 2007 between FAPCO and Oil & Energy Industries Development Company (OEID) IRAN, for re-processing of 2D seismic data of the Blocks. Country of Operation:    TUNISIA – FAWAR & MEZZOUNA Permits Commencement Date:    May 26th, 2007 Effective Date:    16th, June 2007; which is the date contract is signed by both Parties Scope of Work: To process the approx. 3,300 km of full fold 2D Land Seismic…
More
0  Comments
3D Seismic project of Bibihakimeh, Kilver karim, Seyahmakan
Posted By : | Date :04-24-2016
CLIENT: National Iranian South Oil Company (NISOC) TYPE OF PROJECT: Seismic THE GEORAPHICAL LOCATION: 200 Km South of Ahvaz between 4province of Khuzestan, Kohgiloyeh and Boyrahmad, Bushehr, Fars Brief description of project goals: The aim of the project is 3D seismic survey of oil fields of Bibihakimeh, Seyahmakan, Kilver Karim and also providing related services with desert and rugged mountains so that the topography area was changing from flat area to mountainous, but 70% of area is mountainous (elevation changes from 10 to 1200m) and 3D seismic survey data is…
More
0  Comments
Drilling Management Project of Kish Gas Field (12+1)
Posted By : | Date :04-24-2016
Client: Petroleum Engineering and Development Company (PEDEC) The Plan Management of this project was awarded to OEID and Kish Petroleum Engineering Co. (KPE). The execution of this project took 40 months and ended in March 2012. The project activities are as following: Detailed drilling and operation schedule preparation Geology schedule preparation Well complement with a detailed activity schedule Drilling Supervision Well completion supervision Well testing operation supervision Acidizing supervision Geology supervision Well coring supervision Coiled tubing supervision Well logging supervision Coiled tubing supervision
More
0  Comments
Increased Production of Kabod Oil Field
Posted By : | Date :04-24-2016
Client: National Iranian South Oil Company (NISOC) Location: Kabod oil field is located in 70 kilometers north of Andimeshk. Description: The project was to increase the production of oil field up to 12 thousand barrels per day was associated with observing avoid burring gases and avoid compliance is included: Construction of 2 well head equipment (KB2 , KB3) Construction of two series of pipeline 6-inch ground wells KF2 KF3 with Length approximately 6 Km Development Of Kabod Separation Field( KSF) Construction of 10- inch underground pipeline to transport oil along…
More
0  Comments
Project of Natural Gas Storage in the fields of Serajeh, Yourtsha, and Talkheh
Posted By : | Date :04-24-2016
The main purpose of this project is to balance the consumption of gas , to store natural gas in underground structures, optimize gas storage for superior winter consumption and to prevent the disturbances made when problems occur in upstream production and transfer system. In warmer seasons of the year, where the consumption rate of natural gas is lower than production rate, the excess gas will be stored in underground reservoirs and conversely drawn back from the reservoirs during the colder seasons and injected to the transfer system. The storage of…
More
0  Comments