Engineering, Procurement and Construction of Naftshahr Desalting unit

Engineering, Procurement and Construction of Naftshahr Desalting unit

Client: Iranian Central Oil Fields Company (ICOFC)

This Project was awarded to OEID in 2004. The project included the construction of Exploitation unit, desalting unit and Utilities

Location:

NaftShahr oil field is located approximately 100 km northwest of Ilam and 230 km southwest of Kermanshah. It is a common field with Iraq and provides some of the feed for Kermanshah refinery. After Iraq-Iran war, reconstruction of the equipment at this refinery was incomplete and did not have safety equipment and measurement systems. The purpose of this project was design and construct a new production unit and desalting with capacity of 15,000 barrels per day and pressure booting of the associated gas took place in proximity of the existing unit.

Description:

OEID was responsible for the EPCC-Engineering, procurement, construction and commissioning- of this project which also included the construction of buildings. The construction and commissioning included desalting unit, drainage system for hydrocarbon material, compressed air supply, product storage tanks with pipeline to connect between the product transferring line and storage tanks, Branch of the Pipeline input, as well as its building control MMC, fencing, construction of evaporation ponds that come into Operation in 2009

Home > CompletedProjects > Engineering, Procurement and Construction of Naftshahr Desalting unit